Price a project line by line, group it into bills, lock it as the contract, and revise it when scope changes.

What is the BoQ?

The Bill of Quantities lists everything to be built, with a quantity and a rate for each line. Open any project and select Estimation. PMC and QS roles see it named Bill of Quantities, and subcontractors see Quotation.

Estimation · Bill of Quantities
v1ContractReadyCreate revisionAdd
RefDescriptionUnitQtyRateTotal
1 · Preliminaries
1.1Site establishmentitem145,00045,000
1.2Temporary hoardingm3208527,200
2 · Substructure
2.1Excavation to reduce levelsm³1,2501822,500

Direct cost

RM 94,700

Markups (2)

RM 9,470

Contract sum

RM 104,170

  1. 1Version & lock · Lock as Contract, then Create revision
  2. 2Readiness · descriptions, quantities, rates
  3. 3Section · a Bill that groups items
  4. 4Item · Qty × Rate = Total
  5. 5Contract Sum · direct cost plus markups

Add Lines Faster

Copy rows from Excel or Google Sheets and Paste from Excel, or pick a rate from one of your cost catalogs.

Bill of Quantities

Paste from Excel

Auto-detects columns from a header row (Description, Unit, Qty, Rate).

Description⇥Unit⇥Qty⇥Rate
Reinforcement Y12⇥kg⇥8400⇥4.20

Preview (2 rows)

3.1Reinforcement Y12kg8,4004.20
3.2Formwork to columnsm²26062.00
Import

Pick a rate from catalog

Internal Rates 2026

concrete

Ready-mix concrete Grade 30m³310.00
Ready-mix concrete Grade 25m³292.00
  1. 1Pasted data · from Excel or Google Sheets
  2. 2Preview · check before importing
  3. 3Catalog · your own rate libraries
  4. 4Result · choose one to apply its rate

Lock and Revise

When the numbers are agreed, choose Lock as Contract. A locked BoQ can't be edited. To change scope, Create revision to start a new editable version, or use Unlock for an admin correction. Unlocking asks for a reason and is recorded in the audit log.