Build accurate project cost estimates and stay in control of your budget from day one.

What is Estimation?

Estimation is how you calculate a project's cost before work begins. You break the project into tasks, materials, labour, and services, then assign a cost to each one — producing a complete Bill of Quantities (BQ) that guides pricing, cash flow, and budget control.

Estimation lives inside each project in Bestrack. Open any project from your dashboard and select Estimation from the sidebar to get started.

Click "Estimation" to expand · Then click any step to see details

Cost Types

Every line item belongs to a cost type that tells you what kind of expense it is. Click any type below to see what it covers and how it's priced.

Click "Cost Types" to expand · Then click any type to see details

Adding Items

Click Add Estimate in the top right, pick a cost type, then fill in the drawer that slides in from the right. The cost breakdown updates live as you type.

Each item has the following fields:

FieldWhat it means
NameClear description of the item
GroupOptional parent group for hierarchy
Cost CodeOptional trade/category code for reporting
QuantityHow many units are needed
UnitUnit of measurement (m², kg, hour, lot, etc.)
Unit CostWhat you pay per unit (builder cost)
MarkupPercentage added for overhead and profit
StatusIncomplete, Complete, or Not Relevant

How the amount is calculated:

Builder Cost  = Quantity × Unit Cost
Markup Amount = Builder Cost × (Markup % ÷ 100)
Amount        = Builder Cost + Markup Amount

Example: 500 m² of floor tiles at RM 28/m² with 17% markup Builder Cost = RM 14,000 · Markup = RM 2,380 · Amount = RM 16,380

To edit an item, click its row. To delete, use the actions menu on the row.

Organising with Groups

Groups give your estimate a hierarchy. Add a Group item (e.g. 3.0 Foundation Works) to section your estimate, then assign items to it using the Group field. Groups can nest inside other groups for multi-level structure.

Use the arrow next to any group to expand or collapse it. The Expand All / Collapse All button in the toolbar toggles all groups at once.

Filtering and Views

The toolbar above the table helps you navigate large estimates:

  • Search — filter items by name
  • Status filter — show only Incomplete, Complete, or Not Relevant items
  • Group By — switch how items are displayed:
    • Lines (default) — your natural hierarchy
    • Cost Type — flattened and grouped by Material, Labor, Equipment, etc.
    • Cost Code — grouped by cost codes (uncoded items appear under Uncategorised)

Summary Panel

At the bottom of the table, the summary panel shows your project totals:

RowWhat it means
Builder Fixed CostNon-allowance items plus their markup
AllowancesTotal of all provisional sums
MarkupTotal markup amount across all items
TotalGrand total of the estimate

This gives you an instant view of your overall project cost and how much of it is firm versus provisional.

From Estimate to Proposal

Once your estimate is in shape, Bestrack links the total directly into a Proposal — your client-facing offer with payment milestones and a validity window.

Click "Estimate → Proposal" to expand · Then click any stage to see details